Welcome to PetroMaster Website

Blog Image

Engineering Risk Assessment

Engineering systems are almost always designed, constructed, and operated under unavoidable conditions of risk and uncertainty. Risks are future events with a probability of occurrence and a potential for loss. Caught in time, risks can be avoided, negated or have their impacts reduced. Risk analysis is a technique applied for identifying, characterizing, quantifying, and evaluating hazards. Risk assessment is performed to estimate the value of a risk.

About Service

Engineering systems are almost always designed, constructed, and operated under unavoidable conditions of risk and uncertainty

Fin Advice Articles

  • Asset Integrity Assurance
    Image

    Petromaster’s preferred model is a total system approach....

    More..
  • Corrosion Management Programs
    Image

    Petromaster conducts condition assessments for all types of static equipment....

    More..
  • Static Plant Equipment Condition Assessment
    Image

    Petromaster’s Propriety Asset Lifecycle Normalization Solution®...

    More..